Seminar 2: Presentation 1: Step One: Addition of 31 MW PhotoVoltaic Facility at MCLB Albany

Sunday, January 13
8:00 AM–8:20 AM

Location: GWCC, 3rd Floor, Building A, A301

Days: Sunday, 13 January
Session Type: Seminar
Location: GWCC, Building A, A301

Step One: Addition of 31 MW PhotoVoltaic Facility at MCLB Albany
Presenting Author: William Houser, P.E., Georgia Power, Atlanta, GA, USA

The use of Electrical energy at the Marine Base is a large component of the operations. The Base operates a variety of functions in Industrial type operations with support for Military equipment. In review of various options for moving to Net Zero – it was agreed to move toward installation of a PV Facility on 155 acres of Base area. Cooperation between Georgia Power and the Base began the installation but 1 week before ‘going live’ a tornado struck the base and resulted in substantial damage which has now been repaired and operation has been ‘on’.